Georgetown University

Table of Contents

Locations

  1. Construction

    1. Leavey Center Closures

      1. Leavey Bridge Rehabilitation - Bridge closed

        Schedule

        Start Date: Wednesday, Nov. 19, 2025

        End Date: TBD

         

        Description

        Please be advised that the Leavey Center East Bridge, is closed for repairs. There will be no vehicle access through the east entrance until further notice. During this closure, pedestrians may enter through the following entrances:

         

        Other Leavey Center entrances:

          • From the north side, enter via the elevator 5 lobby (accessible entrance)

          • From the east side, enter via stairwell near the bridge and Byrnes Hall

          • From the south side, enter via the Leavey Mid-Campus Terrace near Hariri and Regents Hall

         

        Through connecting floor of Regents Hall:

        • From the east lobby on Tondorf through the second floor (accessible entrance) 

        • From the south lobby through the first floor

        Food and other type of deliveries are not allowed on Tondorf Road at the time.