Window replacement work at Building 720 will begin on Monday, July 13, on the building's northeast side. The project is anticipated to continue through August 16, weather and construction conditions permitting.
Building Access / Alternative Routes:
-
The north pedestrian pathway will be closed.
-
All north entrances to Bldg. 720 will be closed.
-
The exterior northeast entrance to Room 1880 (Weight Training Room) will be closed.
-
The Wellness Center will remain open; however, the interior north side of the facility will be temporarily taped off for the safety of the users throughout the project.
-
Protective fencing will be installed around the north side of the building to secure the work area.
-
Construction vehicles and equipment will access the site from Temple Ave. north of Bldgs. 748, 746, and 744, and will travel along the east side of Bldg. 720.
-
South-side building entrances will remain open and will not be affected.