after the removal of old sawyer library, things have changed a bit. files have been uploaded to give you a visual guide to the changes:
- plans for the new quad area (Quad-Plan.pdf). this is the architect drawing and shows everything that will eventually be there, but not all of it is built.
- the above, plus a layer of information about what has already been constructed, and what has not (quad-sidewalks.png). please add the sidewalks that have actually been constructed to the map. also please add 2 simple sets of stairs to the locations indicated in the diagram.
- drawing of new stetson patio area (Stetson-Plaza.pdf) - the construction of this is nearly done. please update the map to reflect this new area.
- photos of stetson plaza from additional angles:
- stetson-plaza1.JPG is taken from the southwest edge of the plaza facing north (environmental center is in the background)
- stetson-plaza2.JPG is also taken from the southwest edge of the plaza, but facing northwest (hollander is in the background).
- stetson-plaza3.jpg is taken from the top floor of hollander hall, southeast corner, facing southeast (thompson chapel is in background)
if you need any additional information, please don't hesitate to ask.